Sarab Reservoir Dam  
 

 

Location
Client
Consulting Engineers
Conteract Period
Conteract Sum

Dam Height (Above the River)
Crest Length
Excavation
Rock Excavation
Embankment
Reservoir Volume

Torbat Jam, Khorasan
Khorasan Regional Water Authority
Abpooy
9 months (2005)
US$ 1,156,094 / 10,493,871,000 I.R.

24,5 m
234 m
420,000 m3
220,000 m3
485,000 m3
5,590,000 m3